ENG
2.
Installation of the pole
1. Put the pole into installation slot
2. Insert the pin into the aluminium disk
3. Fix the pin by screwing down the bolt
3.
Preparation before use
1. Definition of left-right: When you face tripod turnstile, the poles running in
clockwise are defined left, On the contrary, it's right.
2. Input interface: +12V level signal or DC12V pulse signal with width of more than
100ms, driving current >10mA or dry contact signal or RS485 signal;
3. Link of connection box: Link the terminals according to below marks.
Turnstile operation are provided as follow
1. Dry contact signal: VDD is common port, OPE-L and OPE-R link with VDD
separately ,it mean left-open and right-open;
2. +12V level signal or DC12V pulse signal: GND is common port, OPE-L and OPE-
R connecting with GND separately (Note: High frequency should link OPE-L or
OPE- R)
3. RS485 signal: TA, TB are A+, B- , GND is common terminal
4. Adjustment of single direction free pass: Adjust the bolt of single direction
mechanism, lock the position arm.
5. Check turnstile connection and wiring diagram are same or not, all connection
loose or not, turnstile earthing or not
Attention
1. Without permission, please do not install any devices on the casework. Make
sure devices earthing is reliable
7