PROPANE CONSTRUCTION HEATER
unPacKinG Heater
1. remove heater from carton.
2. remove all protective packing applied to heater for shipment.
3. retain cartons and packaging material until unit is operated and found in good condition.
4. Check heater for any shipping damage. if heater shows any external or internal
damage, promptly inform dealer/distributor where you purchased heater.
Assembly Components and Instructions for RMC-FAIOOC/L and RMC-FA125L/L-01
Tools required for assembly:
phillips head screw driver
and adjustable wrench
1. assemble the leg:
parts required: leg 1 pc
place the heater as shown,
insert the leg into holes of
the base, then adjust
to the desired height.
2. assemble the height Control Screw:
parts required: height Control Screw 2 pcs
Turn the height Control Screw
clockwise to lock it. Turn the
height Control Screw counter-
clockwise to unlock it.
lock, clockwise
5