Positioning The Foundation Box And The Lever Control And Blocking System - AS Torantriebe R50 24V Instrucciones De Uso E Instalación

Operador electromecánico irreversible (montaje enterrado) para cancelas batientes
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

POSITIONING THE FOUNDATION BOX AND THE LEVER CONTROL AND BLOCKING SYSTEM

1. Depending on the dimensions, dig a suitably sized
foundation ditch (it is recommended to provide adequate
drainage in order to avoid water pooling).
2. Place the foundation box inside the trench, with the support
pivot aligned with the hinge axis.
3. Install a conduit for the electrical cables, and another for
drainage.
4. Embed the foundation box in concrete, ensuring it is level
and plumb.
WARNING: ensure that the concrete used is properly cured
prior to proceeding with the following steps.
5. Insert the control rod A over the foundation box supporting
pivot B.
6. Rest the gate leaf on blocking lever C and weld it securely in
place.
7. Grease the mechanism using the appropriate grease
nipple D.
10

Publicidad

Tabla de contenido
loading

Tabla de contenido