Complete The Installation - Kohler K-5293 Guia De Instalacion

Ocultar thumbs Ver también para K-5293:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Complete the Installation

Complete the finished wall.
Install the plated drain caps and washers to the nipples. Securely
tighten.
Turn on the water supply.
Open the drinking fountain supply stop.
Open the drinking fountain control valve. Water should flow
from the drinking fountain and cuspidor.
Inspect both fixtures for leaks or incorrect operation. Adjust as
needed.
Adjust the cuspidor regulator so water flows from the spreader as
desired.
105126-2-AC
12
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-5295

Tabla de contenido