Complete The Installation - Kohler K–6945 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Between the Valves
Spout
Spout
Shank
90˚ Street Ell
(4 shown)
Tee
Copper
Tubing
2. Installation to Valves
NOTE: These steps are necessary only for installations incorporating
side body valves.
Tighten the copper adapter to the spout shank.
Determine the number and lengths of copper tubing pieces
needed to complete the installation.
NOTE: Combinations of copper 90° street ells or copper 90° ells can
be used to make the connection to the valves.
Dry fit the tubing, elbows, and tee and check for proper size.
Solder the joints together when the components fit together
properly.

3. Complete the Installation

Ensure that both faucet handles are turned off (hot = clockwise,
cold = counterclockwise).
Turn on the main water supply and check for leaks.
Turn on the hot and cold valves and run water through the spout
to remove debris. Check for leaks.
Turn off the hot and cold valves.
105614-2-AB
Installation Outside the Valves
Adapter
90˚ Street Ell
(6 shown)
4
Spout
Spout
Shank
Tee
Adapter
Copper
Tubing
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido