Flush Installation
(Top Down View)
2 x 4 Studs
Water-Resistant
Wall Material
1/4" (6mm) Gap
Trim
8. Complete the Installation
Flush Installations
Install water-resistant wall material to within 1/4" (6mm) of the module edge.
Install desired trim (not provided) around the unit to conceal the module edge.
Also install trim along the bottom apron edge.
Alcove Installations
Install water-resistant wall material around the unit to conceal the module edge.
All Installations
Apply a bead of silicone sealant to the nailing-in flanges.
Install water-resistant wall material with the paperbound edge a maximum of 1/4" (6mm) above the
finished, concave surface of the module.
Tape and mud the wall material.
Seal around the valving and outlets with silicone sealant or plumbers putty.
Install the faucet and drain trim according to the faucet manufacturer's instructions.
If used, install the grab bars or towel bars to the backing in the stud wall (previously installed).
Follow the manufacturer's installation instructions.
If used, install the shower door according to the manufacturer's instructions.
Clean up with a non-abrasive cleaner.
9. Clean-Up
CAUTION: Risk of product damage. Do not allow cleaners containing petroleum distillates to remain
in contact with module surfaces for any length of time.
CAUTION: Risk of product damage. Do not use abrasive cleaners.
When cleaning up after installation, use warm water and an approved liquid cleanser to clean the
surface.
Stubborn stains, paint or tar can be removed with turpentine or paint thinner.
1030526-2-A
Alcove Installation
(Top Down View)
2 x 4 Studs
1 x 2 Brace
Module
Water-Resistant
Wall Material
Water-Resistant
1 x 2 Brace
Wall Material
Paperbound
Edge Down
Module
Concave
Surface
1/4" (6mm)
Gap
8
All Installations
2 x 4
Framing
1/4"
Furring
(6mm)
Strip
MAX.
Galvanized
Nail
Silicone
Sealant
Kohler Co.