Installation To Wood Stud Wall - PEERLESS Paramount PS200 Instalación Y Ensamblaje

Repisa para componentes de a/v
Ocultar thumbs Ver también para Paramount PS200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation to Wood Stud Wall

• Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
• Tighten wood screws so that wall plate is firmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder is
highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Installers
are responsible to provide hardware for other types of mounting situations.
Wall plate (B) can be mounted to two studs that are 16" apart. Use a stud finder to locate the edges of the studs.
2
Use of an edge-to-edge stud finder is highly recommended. Based on their edges, draw a vertical line down each
stud's center. Determine the mounting location of wall plate using the formula in step one. Place wall plate on wall
as a template. Level plate, and mark the center of the two mounting holes. Make sure that the mounting holes are
on the stud centerlines. Drill two 5/32" (4 mm) dia. holes 2-1/2" (65 mm) deep. Make sure that the wall plate is
level, secure it using two #14 x 2.5" wood screws (E) as shown below.
Skip to step 3 on page 6.
E
WARNING
STUD
B

Publicidad

Tabla de contenido
loading

Tabla de contenido