Installation In New Construction; Assembly Instructions - New Construction - Hoover 7125-02 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
16. Mount glass globe (C) to connect screw (GG) with one of the
decorative finials (G). Fig. 17
Turn on power at the service panel after finishing installation.

INSTALLATION IN NEW CONSTRUCTION

CAUTION: MAKE SURE POWER IS SWITCHED OFF AT
SERVICE PANEL BEFORE STARTING INSTALLATION.
1.
Insert the suspension brackets (F) into the fan body (A). If
joist spacing is between 21-1/4 in. and 23-1/2 in., connect
suspension bracket I (E) and suspension bracket II (F).
Fig. 18
2.
Position the fan body (A) so that the grille (B) will be flush with
the ceiling board when installed. Fig. 19
3.
Go to step 10 (page 8) to mount light socket assembly (D)
and grille (B). Mount the fan body (A) with the grille (B) and
light socket assembly (D) in place to the joist using the
suspension brackets and long wood screws (AA). Fig. 20
Go to step 5 (page 7). Follow steps to connect fan body (A),
wiring, light socket assembly (D) and glass globe (C).
10
Fig. 17
Fig. 18
Fig. 19
Grille
Fig. 20
www.homewerksww.com
Ceiling
board

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido