Installation
8
FLANGE
FIGURE 8-A
SCREw (B)
FIGURE 8-B
STEP 8: OVEN INSTALLATION
MOUNTING TEMPLATE: Align the mounting template center line with
the center of the cutout and the floor line with the floor of the cutout.
Tape it into place. Predrill 4 holes marked "A" with a 1/16" drill bit.
Remove template from the cabinet.
CAUTION: Never hold the handle when moving the oven. Two persons
are required to install the oven.
E
CL
SCREw (B)
8.1 Establish center line of opening and mark front edge.
8.2 Place the oven on a table or stand positioned in front of the
cabinet where the oven is to be installed. One person should
hold the oven while the other connects it to the electrical outlet.
8.3 Install the oven into the shelf with adjusting
DUCT BOTTOM to the center line marked on front edge as
shown in Figures 8 and 8-A. Then push the oven until the flange
of EXHAUST DUCT BOTTOM touches the edge of the wall or
cabinet opening. Avoid pinching the cord between the oven and
any wall as shown in Figure 8.
8.4 Secure EXHAUST DUCT BOTTOM to the shelf with 2 screws (B)
as shown in Figure 8-B.
9
SCREw (B)
SCREw (B)
STEP 9: FRAME INSTALLATION
Position the BACK FRAME to align with the predrilled holes that were
drilled with the mounting template. Check that it is level and then
secure with four SCREwS (B). See Figure 9.
!
SNAP
AT TACHMENT
STEP 10: DECORATION INSTALLATION
Place the FRONT decoration onto the FRAME and align ball studs
and receivers. Secure the DECORATION to the FRAME by firmly
pushing the front frame onto the back frame engaging the four (4)
snap attachments. See Figure 10.
7
mark on EXHAUST
SCREw (B)
SCREw (B)