Descargar Imprimir esta página

ROTOR POWER LT Guía Rápida página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

CALIBRATION / ZEROING
Calibrate your ROTOR POWER LT R for an accurate
power measurement. ROTOR POWER LT R should be
calibrated after any chainring, frame, or pedal changes.
A second calibration is
recommended after the first
30 hours of use.
To zero your ROTOR
POWER LT R:
1.
Activate the system and
place the right crank in 6
o´clock vertical position.
Do not move your cranks
during steps 2 and 3.
2.
Push "CALIBRATE" button
on your ANT+
.
TM
(Menu: Settings\Bike settings\Bike
profiles\"Your profile"\ANT+Power)
3.
Read the feedback value for
the drive side crank from
5
QUICK GUIDE - CALIBRATION / ZEROING
your device. Value should be between 100-3900 .
WARNING!
In order to save energy the "CALIBRATE"
command is admitted only within 60 seconds from
startup or last valid power readings.
For more information read the USER MANUAL or visit our web:
www.power.rotorbike.com

Publicidad

loading