Cord Connections - Eaton Powerware 5125 Guia De Instalacion

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4. Connect the REPO connector to the REPO port on the UPS rear
5. Verify that the externally-connected REPO switch is off to
6. Plug in the UPS and start the UPS by pressing the On button.
7. Turn on the external REPO switch to test the REPO function.
8. Turn off the external REPO switch and restart the UPS.

Cord Connections

Figure 4 shows a typical installation. Figure 6 on page 10 shows four
different rack configurations with cord connections.
NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur
to your equipment and void your warranty.
1. If installing an optional EBM, continue to Step 2; otherwise,
2. Plug the EBM cable into the UPS battery connector (see
3. Plug the other end of the EBM cable into the EBM battery
4. If installing a second EBM, plug the EBM cable into the battery
Powerware
5125 Installation Guide for IBM Applications
®
panel.
Figure 3. REPO Connector
enable power to the UPS output receptacles.
skip to Step 5.
Figure 4).
connector.
connector of each EBM. Up to four EBMs may be connected to
the UPS.
:
164201356 B Uncontrolled Copy
Pin 1
Pin 2
Installation
7

Publicidad

Tabla de contenido
loading

Tabla de contenido