BOILER ASSEMBLY
H
Model
55 PM/2-E
70 PM/2-E
90 PM/2-E
140 PM/2-E
210 PM/2-E
1
4
3
2
F
G
M14
180
225 ÷ 283
M14
180
225 ÷ 283
M14
180
283
M14
210
283
M14
240
318
1
Fix flange (2) to the boiler using 4 screws (3) and
insert the insulating seal (4). Insert the burner into
H
the flange so that the draught tube penetrates the
combustion chamber for the length indicated by
the boiler manufacturer. Tighten the screws (1) to
lock the burner into position.
2
3
46