Complete The Installation - Kohler K-7158 Guia De Instalacion

Ocultar thumbs Ver también para K-7158:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Stopper
Jam
Nut
Lift Toggle
6. Adjustments
If adjustment is required, remove the stopper assembly from the
drain and loosen the jam nut below the stopper.
Turn the nut counterclockwise to raise the stopper or clockwise to
lower the stopper.
Tighten the nut.
If sufficient clearance cannot be obtained by adjusting the stopper,
remove the lift rod assembly and loosen the locknut.
Rotate the turnbuckle counterclockwise to lengthen the lift rod or
clockwise to shorten the lift rod.
Tighten the locknut, reinstall the lift rod assembly and check the
clearance.

7. Complete the Installation

Make sure all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks.
1018153-2-B
Lift Rod
Locknut
Turnbuckle
Spring
8
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-7159K-7178

Tabla de contenido