Ac Connection - Danfoss UniLynx Outdoor Serie Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Illustration 2.9: PV Connection
Illustration 2.10: Individual Configuration
Illustration 2.11: Parallel Configuration
The inverter runs an automatic PV configuration test just after connection to grid. During this test
the configuration of the PV modules is determined. The inverter will always run according to the
configuration of the PV modules.
For the inverter equipped with a display unit, the status of the test and the result can be found in
menu B in the display.

2.1.5. AC Connection

The inverter must be connected
to the earth wire in order to pre-
vent injury to the user.
Ensure that the power supply is disengaged using the power disconnect switch before connecting
the power cable.
PV Connection (3)
Wiring from the PV panels is connected to the
inverter via Multi-Contact connectors.
Individual Configuration
Individual configuration is used when PV pan-
els have different angles, orientation, or are of
varying types.
This is the default setting.
Parallel Configuration
Parallel configuration is used when all PV pan-
els are identical both in type and in system in-
stallation.
Master/Slave set for parallel configuration.
L00410363-05_2q
2. Installation and Setup
Make sure the AC grid is switch-
ed off at the mains breaker be-
fore connecting the mains cable.
2
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ulx 1800oUlx 3000oUlx 3600oUlx 5400o

Tabla de contenido