Unpacking The Device - Kaco Powador 39.0TL3 Instrucciones De Operación

Ocultar thumbs Ver también para Powador 39.0TL3:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 79
ž Unobstructed air circulation.
ž Close to the ground, accessible from the front and sides without requiring additional resources.
ž Protected on all sides against direct weather exposure and sunlight (thermal heating) in outdoor areas. Implementa-
tion where necessary via constructional measures, e.g. wind breaks.
Installation surface
ž Must have adequate load-bearing capacity
ž Must be accessible for installation and maintenance
ž Must be made out of heat-resistant material (up to 90 °C )
ž Must be flame resistant
ž Minimum clearance during installation: [See figure 7] [} Page 15] and [See figure 8] [} Page 15]
735 mm
140 mm
766,5 mm
Fig. 3: Drill stencil for device
6.2

Unpacking the device

↻ The device is transported to the installation location.
1 Remove the plastic band from the pallet and packaging.
2 Pull the hood upwards to remove it and place the cardboard packaging to one side together with the accessories.
3 Remove protective corners.
4 Remove the cover from the device.
» The device is prepared for assembly and installation.
Fig. 5: Unpacking the device
Key
1
Cardboard box cover
Page 14
45 mm
Fig. 4: Allowed installation position
1
2
3
Fig. 6: Transport device for erection purposes
4
Powador 39.0TL3 , Powador 39.0 TL3 M1 , Powador 40.0 TL3 , Powador 48.0 TL3 Park , Powador 60.0 TL3 ,
Cover
4
5
Powador 72.0 TL3 Park

Publicidad

Tabla de contenido
loading

Tabla de contenido