DIVERSITECH CP-22LP-P Manual Del Usuario página 7

Bomba de condensado clasificada para pleno/ plenum
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (cont.)
Support pump and piping when assembling and when installed. Failure to do so may
cause piping to break, pump to fail, motor bearing failures, etc.
2
2. Level Unit
Ensure that condensate pump is level. If unit is out of level by more than 15º
from horizontal surface, it will not function properly and warranty and property
protection will not be valid.
Outlet Connection
3
3. Install Outlet Tube Connection
Attach plastic tubing to check valve and secure with hose clamp (sold
separately). Route tubing up and away from condensate pump (avoid
compressing or kinking tubing).
3/8" Clear Vinyl
Plastic Tubing
5/8" Hose Clamp
1
Check Valve
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cp-22lp-230-p

Tabla de contenido