Mitsubishi Electric PEH-P8MYA Manual De Instalación página 4

Ocultar thumbs Ver también para PEH-P8MYA:
Tabla de contenido

Publicidad

7
[Fig. 7.1.1]
A
[Fig.7.1.3]
* In case of PEH-P8, 10
F
A Brazing
B Flare joint
C Gas pipe
D Liquid pipe
E Service port
F Indoor unit
G Outdoor unit
[Fig.7.2.1]
A
B
8
[Fig.8.0.1]
G
E
F
B
[Fig.8.0.2]
* In case of PEH-P8, 10
D
A
B
C
A Inlet duct flange
C Sensor protection plate
E Inlet duct
4
A Remove the cap
A
C
A
E
D
A
C
F
D
H
G
D
C
A
10mm
E
12.5
25~100mm
B Inlet temperature sensor
D Sensor fixture
7.1
[Fig. 7.1.2]
A
A
D
* In case of PEH-P16, 20
F
G
B
E
7.2
E
I
J
A Air inlet
B Air outlet
C Access door
D Ceiling surface
E Canvas duct
F Keep duct-work length 850 or more
G Connect common reference potential wire between duct-work to air conditioner
* In case of PEH-P16, 20
A
B
C
C
B
A Thermal insulation
E
B Pull out insulation
C Wrap with damp cloth
D Return to original position
E Ensure that there is no gap here
F Wrap with insulating tape
F
E
A
A
A
B
C
A
E
A
D
B
A Insulator
B Drain pipe Rc1
C Drain pan
D
> =
70 mm
G
2 × F
E
> =
> =
70 mm
F
> =
35 mm
G Downward slope 20mm/m or more
H Drain trap
I The drain pipe should extend below this level.
J Open drain
D
10 mm
E
2-
12.5
25~100 mm
(No.2)
G
E
(No.1)
G
E

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Peh-p10myaPeh-p16myaPeh-p20mya

Tabla de contenido