INSTALLATION
WALL DRILLING AND BRACKET FIXING
A
(2)
B
B
(OPTIONAL)
135
C
(3)
112.5
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line A at 1270 – 1560 mm above the cooker top.
A horizontal line B at a minimum 887 (840 optional) mm above the cooker top.
A horizontal line C at a minimum 717 mm above the cooker top.
Mark Points:
Mark a point (1) on the horizontal line A, 40 mm to the right of the vertical reference line.
Repeat this operation on the other side, checking that the two marks are leveled.
Mark a point (2) on the horizontal line B, 80 (135 optional) mm to the right of the vertical reference
line.
Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
40
(1)
40
80
80
135
112.5
12
EN-5
21
10
20
10
Optional
10
11
11
11