Toto ZN TBP01301U Manual De Instalación Y Del Propietario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION PROCEDURE
Caulking
4. Apply silicone caulk to water-
proof the clearance between the
plaster guard and the floor, and
lower the plaster guard down to
the finished floor surface.
Mounting the hand shower
and hose
5. Make sure that the gasket
is mounted adequately, then
mount the shower hose and the
hand shower. This completes
product installation.
Testing the water supply connec-
tions.
6.Turn on the water supply and
confirm that water comes out
from the spout and shower. Check
around the hose connections and
clearances for any water leakage.
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gr tbg02306uZl tbp02303u

Tabla de contenido