Product Overview
Top View
Back View
Bottom View
Product Dimensions
Removing the Hoist Ring (Optional)
To remove the hoist ring from the DRB-F100CM:
1. Unscrew the nut from the hoist ring bolt.
2. Lift the hoist ring out of the product.
3. To re-install the hoist ring, reverse the previous steps.
Hoist ring assembly
Warning! Replacing the hoist ring with other hardware may change the load capacity of the product!
DRB-F100CM QRG Rev. 2
QUICK REFERENCE GUIDE
Alignment conicals
Female speego connection
Male speego connection
For TR16 screw jacks
Alignment holes (x4)
39.35 in
999.6 mm
39.55 in
1,007.4 mm
Alignment magnets (x5)
Alignment bolts
Side View
6.65 in
4.72 in
169 mm
120 mm
5.2 in
132 mm
2.36 in
60 mm
Hoist
ring
Bolt
Nut
EN
2