EN
Mounting (Hanging)
Before mounting this product, read the
Mounting Diagram (Hanging)
Alignment
conical (x4)
Mounting Procedure
1. Insert alignment conicals into the alignment holes and allow magnets to connect.
2. Insert the rig bar speego locking bars into the female speego connections on the F-series panel.
3. Twist the spring knob on the rig bar speego by 90°, until it locks into place.
4. Twist the tightening knob clockwise until F-series panel is secure to the rig bar.
5. To detach the rig bar from the F-series panel, reverse the previous steps.
Warning! The magnetic attachments are not load-bearing, and are intended for alignment assistance
only. Do not release panel until the hanging hardware has been fully secured.
Technical Specifications
Dimensions and Weight
Length
39.35 in (999.6 mm)
Load Capacity (Hanging)
1,300 lb (590 kg)
Note: Dimensions in inches are rounded.
Ordering
Product Name
DRB-F100CM
5
QUICK REFERENCE GUIDE
Safety
Notes, as well as those for the attached products.
Male speego
connection
Width
2.36 in (60 mm)
Load Capacity (Stacking)
2,000 lb (900 kg)
Item Name
DRBF100CM
Tightening
Height
4.72 in (120 mm)
Recommended Shackles
Item Code
23091601
Rig Bar Speego
Spring
knob
knob
Locking
bar
Female speego
connection (x2)
(For use with
DRB Curve Kit)
Weight
20 lb (9.1 kg)
1/2", 5/8"
UPC Number
781462219499
DRB-F100CM QRG Rev. 2