General Prerequisites For Operating The Devices - Festo 8129208 Instrucciones De Utilizacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Single-Phase Energy Measurement Box – Operating Instructions

1 General prerequisites for operating the devices

General requirements for safe operation of the devices:
National regulations for operating electrical systems and equipment must be observed in industrial
facilities.
The laboratory or classroom must be overseen by a supervisor.
A supervisor is a qualified electrician or a person who has been trained in electrical engineering,
knows the respective safety requirements and safety regulations, and whose training has been
documented accordingly.
The laboratory or the classroom must be equipped with the following devices:
An emergency-off device must be provided.
At least one emergency-off device must be located within, and one outside of, the laboratory or the
classroom.
The laboratory or classroom must be secured so that operating voltage and compressed air supply
cannot be activated by any unauthorized persons, for example by means of:
Key switches
Lockable shut-off valves
The laboratory or classroom must be protected by residual current devices (RCDs).
Electrical devices (e.g. power supply units, air compressors and hydraulic units) may only be
operated in training rooms which are equipped with residual current devices.
Type-B residual current devices with a residual current of ≤ 30 mA must be used.
The laboratory or classroom must be protected by overcurrent protection devices.
Fuses or circuit breakers
No damaged or defective devices may be used.
Damaged devices must be barred from further use and removed from the laboratory or classroom.
Damaged connecting cables, pneumatic tubing and hydraulic hoses represent a safety risk and
must be removed from the laboratory or classroom.
6
© Festo Didactic 8130877

Publicidad

Tabla de contenido
loading

Tabla de contenido