Start-Up - entrematic Ditec E1A Manual De Instalación

Ocultar thumbs Ver también para Ditec E1A:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 84
8. Starting
Bridge the NC safety contacts with a jumper.
Before starting up, check the application type selected (see JR6 jumper).
Any limit switches installed must be adjusted so that they are triggered near the mechanical
opening and closing end stops. Set TM=MAX.
NOTE: limit switches must be kept pressed until the operation has been completed.
If no limit switches are installed, bridge terminals 0-11 and 0-12 with jumpers and set TM to
half.
Set TC=MAX. Set RF=CT-3 and R1 to half.
Using DIP2, set the direction.
Switch on power.
WARNING: The following operations are performed with no safety devices.
Perform opening and closing commands and check that the automation functions correctly
and that the limit switches (if installed) are correctly set.
NOTE: if mechanical stops are used to block the stroke of the automation, or a proximity limit switch
with N.O. contact, adjust the TM trimmer in order to obtain an operation time 2-3 s greater than
the time effectively taken by the automation.
Connect the safety devices (removing the relative jumpers) and check that they function correctly.
If required, regulate the automatic closing by means of the TC trimmer.
Set RF to a position that allows the automation to function correctly while ensuring the safety
of the user in the event of collision.
Set obstacle thrust with R1.
NOTE: ensure that the forces exerted by the door wings are compliant with EN12453-EN12445
regulations.
Connect any other accessories and check operation.
Once the start up and check procedures are completed, close the container.
35

Publicidad

Tabla de contenido
loading

Tabla de contenido