Descargar Imprimir esta página

Eiko VTU-20/20W/8-U-GY Serie Instrucciones De Instalación página 2

Publicidad

INSTALLATION:
ALWAYS TURN OFF THE POWER SUPPLY FROM MAIN CIRCUIT BREAKER FIRST!
1. HOLD THE FIXTURE TO THE MOUNTING SURFACE AND MARK THE POSITION OF SCREW HOLES.
2. REFER TO THE DIAGRAM, DIRLLING THE HOLE AT EACH MARK. (FIG 2)
3. INSERT A PLASTIC ANCHOR (NOT INCLUDED) INTO EACH HOLE.
4. REFER TO THE DIAGRAM, STRIPPING THE WIRES. (FIG 3)
5. CONNECT THE WIRE WITH POWER INPUT LINE IN JUNCTION BOX. (L=BLACK, N=WHITE, G=YELLOW/
GREEN).
6. HOLD THE FIXTURE TO THE MOUNTING SURFACE AND MAKE SURE THE HOLES ARE ALIGNED.
7. INSERT M6 SCREW INTO EACH HOLE, AND TIGHTEN BOTH SCREWS TO SECURE FIXTURE.
8. APPLY WATERPROOF SEALANT TO SEAL ANY GAPS AROUND THE WALL AND JUNCTION BOX.
WALL MOUNTING
1
CEILING MOUNTING
1
EiKO Global | 23220 W 84th St, Shawnee, KS 66227 | (P) 1-800-852-2217
EiKO Canada | 81 King St, Barrie, Ontario L4N 6B5 | (P) 1-705-721-5189
2
2
3
3
4
4
eiko.com

Publicidad

loading

Este manual también es adecuado para:

Vtu-20/20w/840-u-gy10651