Kohler K-7500 Guia De Instalacion página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Shank
Supply
Tube
Coupling
Nut
Supply
Stop
3. Supply Connections
Ground joint: slip coupling nut onto supply tube.
Carefully position round end of supply tube squarely to inlet of
faucet or bubbler shank and supply stop.
Tighten all nuts.
4. Installation Checkout
Turn on the main water supply and check for leaks. Repair as
needed.
Turn on hot and cold faucet handles and run water for about a
minute to remove debris.
Turn faucet handles off.
Kohler Co.
5
105218-2-AB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-7504K-7510K-7520K-7524

Tabla de contenido