32
UK
14 ELECTROLOCK MOUNTING
-
[14a]
Refers to pictures
À Electrolock.
Á Electrolock fixing plate.
 Bolt hooker.
à Bolt hooking rabbet.
Ä Bolt.
Å Key cylinder (on request).
Æ Gate.
15 FINAL CHECKS
-
Power the automatic system:
• If installed, check the correct reading of the limit switches (optional), manually moving the leaf.
Run one or more opening and closing complete cycles checking:
• The correct operation of safety devices;
• The regular movement of the leaves;
• The solidity of the foundation plate;
• That the automatic gate complies with the essential safety requirements required by the Machinery Directive
(2006/42/CE)
16 MAINTENANCE
-
Carry out periodic checks on the gate with particular attention to:
• Check the hinges;
• Check the correct operation of safety devices;
• Unlock the operator and verify there is no friction points during the whole stroke;
• Check the self-lubricating bushing.
Periodically check the correct functioning of anti-crushing safety and the efficiency of the unlocking system which
allows the manual operation (see the relevant paragraph).
The safety devices installed must be checked at least each six months.
Gi.Bi.Di. S.r.l. reserves the right to modify the technical data without prior notice, depending on product
development.
17 MALFUNCTIONING
-
In the event of any malfunction, cut the power of the system and call in a qualified technician (installer).
During out of service, activate the manual release to allow manual opening and closing.
[14b]
and
. The electrolock must be installed on leaves longer than 2.5 m.
TOP EVO