"Before switching on the machine, ensure
the following:
- The mains switch is on;
- The water mains tap is open".
CAREFULLY PAY ATTENTION TO THE
SEQUENCE FOR ACTIVATING THE SWITCHES
(1) AND (1A).
Press the luminous main switch (1); the related indicator
light switches on and the key LEDs also light up.
If the water level in the boiler is lower than the minimum
restored pressure in the manometer-pump.
During heating, if one of the coffee dispensing push
buttons is pressed, the machine dispenses a coffee at the
temperature reached at the time.
Heating is completed when the boiler gauge indicator (14)
remains stable in the P green area.
The machine is now ready to dispense coffee, steam and
hot water.
To make sure that the dispenser unit and the filter
holder (10) are at similar temperatures, press the coffee
dispensing push button (18) and let the machine dispense
coffee for a few seconds. Then press again the push button
(18) to stop dispensing.
USE
10. Setting at work
ONLY AFTER
completed should you press the light switch that
activates the resistance (1A); the related indicate light
switches on and the heating phase begins.
Wait until the operating pressure (approx. 1.2 bar) appears
on the manometer (14).
At this point, the machine is ready for use.
11. Heating phase
1
ON
18
14
10
1a
ON
P