Installation; Mounting The Outdoor Unit; To Provide The Installation Structure; To Install The Outdoor Unit - Daikin AZQS100B8V1B Manual De Instalación

Ocultar thumbs Ver también para AZQS100B8V1B:
Tabla de contenido

Publicidad

Model
Cooling
AZQS
–5~46°C
4

Installation

4.1

Mounting the outdoor unit

4.1.1

To provide the installation structure

Prepare 4 sets of anchor bolts, nuts and washers (field supply) as
follows:
(mm)
a
Make sure not to cover the drain holes.
INFORMATION
The recommended height of the upper protruding part of
the bolts is 20 mm.
NOTICE
Fix the outdoor unit to the foundation bolts using nuts with
resin washers (a). If the coating on the fastening area is
stripped off, the nuts rust easily.
a
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385528-1C – 2016.10
Heating
–15~15.5°C
4× M12
a
4.1.2

To install the outdoor unit

4.1.3

To provide drainage

Make sure that condensation water can be evacuated properly.
INFORMATION
If necessary, you can use a drain plug kit (field supply) to
prevent drain water from dripping.
NOTICE
If drain holes of the outdoor unit are covered by a mounting
base or by floor surface, raise the unit to provide a free
space of more than 150 mm under the outdoor unit.
Drain holes (dimensions in mm)
A
160
620
B
36
61
262
416
595
A
Discharge side
B
Distance between anchor points
C
Bottom frame
D
Drain holes
E
Knockout hole for snow
Snow
In regions with snowfall, snow might build up and freeze between the
heat exchanger and the external plate. This might decrease the
operating efficiency. To prevent this:
1 Drill (a, 4×) and remove the knockout hole (b).
4 Installation
4× M12
160
C
D
E
Installation manual
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Azqs125b8v1bAzqs140b8v1bAzqs100b7y1bAzqs125b7y1bAzqs140b7y1b

Tabla de contenido