Descargar Imprimir esta página

Elnur Gabarron SOLAR BOX USB Instrucciones De Instalacion Y Uso página 15

Gestor de excedentes fotovoltaicos acumuladores elnur gabarron

Publicidad

Idiomas disponibles

Idiomas disponibles

You can check that the meter has been linked by looking at the device LED.
LED flashing every 2 seconds
LED flashing every half a second
4. G CONTROL HUB USB RESET
G Control Hub USB can be reset using the button of the unit:
-
Keep pressed the button for 10s to reset the configured Wifi Network.
-
Keep pressed the button for 20s to remove all the installed heaters (radiators, storage heaters...)
Press "Star Search" button and use a clip to press the small button
placed at the top of the meter.
LEDS Status
LED off
The last step is to set a name for the meter and select the type
of circuit to indicate if the meter that is being linked is PV
generation or home consumption meter.
These settings can be modified later in the Config section of
the G Control Power Meters.
Once linked both meters, the installation of the SOLAR BOX
has finished.
The option main circuit must be activated in both G Control
Power Meters (Generation and Home Consumption).
Description
Not linked
Correctly linked
Correctly linked with the G Control
Hub, but currently lost the connection
14
EN

Publicidad

loading