Descargar Imprimir esta página

BK RESOURCES STESW Serie Manual De Instalación Y Funcionamiento página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

4. A) Attach the Side Shelf Brackets using the Capped Nuts provided. The Left & Right Side Shelf
Brackets have threaded studs which will point to the outside of the Steam Table when installed.
Note: Do not fully tighten Capped Nuts. B) Install the Side Shelf on the Side Shelf Brackets.
The Side Shelf will be positioned between the Body and the Side Shelf Brackets and the slots on
the Side Shelf will go over the threaded studs on the Left & Right Side Shelf Brackets. The Capped
Nuts may now be fully tightened down.
5. A) Place Cutting Board on top of the Side Shelf. B) Using the Cutting Board Brackets and Capped
Nuts, secure the Cutting Board to the Side Shelf. C) After plugging into an outlet, the Steam Table is
ready for use. Note: Please make sure drain valves are closed prior to use.
120 Frontage Road, Altamont, IL 62411 | P: 888-310-4393 | F: 618-483-9898 | F: 888-310-4394
STEAM TABLE MANUAL
5

Publicidad

loading

Este manual también es adecuado para:

Stesw-2-120Stesw-3-240Stesw-5-240Stesw-4-240