Descargar Imprimir esta página

Watts QuickTurn QT Serie Instrucciones De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Packaging
QT QuickTurn™ Water Closet Carriers typically ship in two components. The carrier
faceplate assembly anchors to the floor and supports the bowl. The carrier fitting
attaches to the rear of the faceplate assembly, and connects to the sanitary piping
system.
All Watts faceplates are shipped pre-assembled. 500 lb., 750 lb., and Floor Mounted
Back Outlet faceplates ship boxed. 1000 lb. faceplates and carrier fittings ship loose.
500 lb. Carrier Installation
1.) Locate the rough-in dimension for the fixture outlet centerline from the floor on the
bowl manufacturer's rough-in sheet. Uprights are scored with incremental height
markings to reference the nipple centerline. Adjust the uprights to match the
carrier nipple centerline to the bowl outlet centerline by loosening the upright hex
bolts. Note for low rough-ins, the rounded bottom of the faceplate may need to
be removed along the scored lines.
2.) Attach each carrier upright to a concrete floor with a minimum of one 1/2" dia.
anchor bolt (supplied by others).
3.) Position the oval fitting gasket between the faceplate and the fitting, with the
gasket lip facing back towards the fitting. Making sure the oval gasket is properly
seated, loosely attach the faceplate assembly to the carrier fitting through the
gasket ears with four 1/2" flanged hex bolts (supplied).
Wall Plate
Wall Plate
Nipple
Nipple
Faceplate
Assembly
Mounting Stud
Mounting Stud
Upright
Upright
2
Carrier
Fitting
Fitting Gasket

Publicidad

loading

Productos relacionados para Watts QuickTurn QT Serie