Descargar Imprimir esta página

Cequent Performance Products 75992 Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

5. There is a wide notch on the outside end of both rails which allows pull wire ⑥ to
enter. Use the kink wire method in Figure 4 to feed carriage bolt ① and spacer ②
through notch on bottom of frame rails.
8. Using the rearmost hole on each side of hitch bracket as a template, drill 17/32''
holes through the frame rail. Repeat step 5 to feed the fasteners and secure the
hitch with conical washer ③ and hex nut ⑤.
9. Tighten all ½-13 GR5 fasteners with torque wrench to 75 Lb.-Ft. (102 N*M)
Proper torque is needed to keep the hitch secure to the vehicle when towing.
©2015 Cequent™ Performance Products, Inc. - Printed in Mexico
6. Raise hitch into position over the exhaust and sandwich the heat shield between hitch
and frame rail. Remove pull wires and loosely install conical washer ③ and hex nut ⑤
to the hitch.
7. Tighten all ½-13 GR5 fasteners with torque wrench to 75 Lb.-Ft. (102 N*M)
Proper torque is needed to keep the hitch secure to the vehicle when towing.
10. Raise the exhaust back into position.
CEQUENT
Sheet 5 of 15
75992NP
03-26-15
Rev. B

Publicidad

loading

Este manual también es adecuado para:

8768244764