Totally there are two metal brackets.
Find the 4 nuts in the package and fit
them into the 4 screws. Make sure the
distance between the bottom of the
heater and the floor is no less than
20cm when the heater is installed.
Insert the control panel into the holder.
Lift the heater and aim the four screws
on the side of the heater to the 4 holes
on the brackets.
Install the control panel holder onto the
wall beside the heater.
EN
17