Section 3. Installation Instructions; Materials And Tools; Installing The Control Box - Jandy Levolor K-1100 Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 10
ENGLISH

Section 3. Installation Instructions

3.1

Materials and Tools

Installation Materials Supplied for
Levolor
Models K-1100, LX2, or
®
LEV110CK/2G
Sensor with Wire
Solenoid Valve
Coupler
Control Box
Remote Sensor Housing
Hardware Kit
Grease-Filled Wire Nuts for Valve
Screws
Anchors
Owner's Manual - Warranty Information
Installation Materials Furnished for
Levolor II, Model K-2300
Sensor with Wire
Solenoid Valve
Coupler
Control Box
Remote Sensor Housing
Hardware Kit
Grease-Filled Wire Nuts for Valve
Screws
Anchors
Owner's Manual - Warranty Information
Additional Materials Needed for Installation
Anti-siphon Valve*
2-Conductor, 18-Gauge Solid-Core Burial Cable
Wire Nut Connectors for the Sensor and Power
Connections
*The anti-siphon valve is not necessary if the
connection is made from the irrigation system.
Open the box and check to see that it contains the
contents listed above. If it does not, contact your dealer
or Zodiac technical support at (800) 822-7933.
Jandy Levolor
Electronic Water Leveler
®
Models K-1100, LX2, K-2300, and LEV110CK/2G
3.2
NOTE When installing a Levolor on a spa (less than
Qty
Models K-1100, K-2300, and LEV110CK/2G
1.
1
1
1
2.
1
1
1
3.
2 per kit
4 per kit
4 per kit
4.
1
Qty
Model LX2
2
1.
2
2
2.
1
2
2
2 per kit
4 per kit
4 per kit
1
|

Installing the Control Box

300 sq ft of surface area), turn the flow control
down to reduce the flow rate of the valve.
Mount the control box to the wall near the pump
and filter. See Figure 1. Do not install the control
box within 10 ft (3 m) of the pool edges.
Mount the control box at eye level. Leave
sufficient clearance on all sides of the chassis
backplate.
Check the source voltage. (All three (3) units are
factory wired for 220 volt operation.) To modify
the wiring for 110 volt operation, see Section 3.3.
For 220 volt operation, connect the black wire to
line 1 and connect the black wire with the yellow
stripe to line 2. See Figure 4.
Mount the control box in the static pipe where the
sensor is installed. See Figure 2.
Check the source voltage. (There are separate units
for 220 and 110 volt operation.)
a. For 220 volt operation, connect one (1) of the
black wires to line 1 and the other black wire to
line 2. See Figure 7.
b. For 110 volt operation, connect the white wire
to the white neutral line. Then connect the black
wire to the black power line. See Figure 8.
Installation and Operation Manual

Publicidad

Tabla de contenido
loading

Productos relacionados para Jandy Levolor K-1100

Este manual también es adecuado para:

Levolor lx2Levolor k-2300Levolor lev110ck/2g

Tabla de contenido