Nice BIG METRO Manual Del Usuario página 4

Ocultar thumbs Ver también para BIG METRO:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
2
1 Photocell post
2 Pair of opening stops
3 230V line
4 Control panel (electrical panel)
3.5 - Mounting: Overall Dimensions and Positioning of
Foundation Box
1 Dig a generously sized foundation pit to house the foundation box (fig. 3):
prepare a drain pipeline for draining off water and avoid the build-up of
water.
2 If the gate is equipped with its own mechanical stops (fig. 2) skip directly to
point 3. Otherwise secure the opening limiter accessory to the box (see
paragraph 4).
3 Place the box inside the foundation hole; the stud must be aligned with the
axis of the hinge (fig. 3).
3
1- Hinge
2 – English
www.metalines.com
2- Pin
3- Concrete
5 Aerial
6 Flashing light
7 Photocell
8 Box with BIG METRO actuator
4 Provide a duct for the electrical cables and a drainage pipe.
5 Bury the foundation box in concrete, making sure it is set level.
6 Mount the control bracket on the box's stud along with the ball (fig. 4).
7 Set the gate leaf on the release lever and weld them securely.
8 Grease using a suitable grease nozzle.
4
3
4
5
Release lever
2 Connecting lever
3 Ball
9
Vertical electric lock
10 Key-operated selector switch or
digital keypad
11 Connector block (not supplied)
4 Control bracket
5 Pin
sales@metalines.com
1
2

Publicidad

Tabla de contenido
loading

Tabla de contenido