Finishing The Installation - minkaAire Contractor LED F556L Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 1. Tuck connections neatly into ceiling outlet box.
Step 2. Remove one screw from the hanger bracket and loosen the other screw
around 1/4" .
Step 3. Align the canopy up to ceiling and over the loose screw. Place the canopy into
key hole and rotate canopy clockwise. (Figure 14)
Step 4. Secure the canopy by use previous removed screw.
Step 5. Place the canopy cover to the canopy and rotate canopy cover clockwise until
it is locked into right position. (Figure 14)

FINISHING THE INSTALLATION

OUTLET BOX
HANGER
BRACKET
HANGER
BALL
Fig. 14
6
CANOPY
CANOPY
COVER

Publicidad

Tabla de contenido
loading

Tabla de contenido