Replacing Led; Testing And Commissioning; Testing - Key Automation RÉVO+ REP2024 Instrucciones Y Advertencias Para Su Instalación Y Uso

Motorreductor para cancelas batientes
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27
EN

4.5 - Replacing led

Switch-off the power supply. Open the cover as shown on
paragraph 4.3.
By using a screwdriver, release the bottom screw of the cover
(Fig. 18a). Remove the mask and pull out the led band (Fig.18b).
5 - TESTING AND COMMISSION THE AUTOMATION
The system must be tested by a qualified technician, who must
perform the tests required by the relevant standards in relation to
the risks present and must check that the installation complies with

5.1 - Testing

All the system components must be tested following the procedures
described in their respective operator manuals;
ensure that the recommendations in Chapter 1 – Safety Warnings
- have been complied with;
check that the door can move freely once the automation is
released and that it is in balance and therefore remains stationary
if left in any position;
5.2 - Commissioning
Once all (and not just some) of the system devices have passed
the testing procedure, the system can be commissioned;
the system's technical dossier must be produced and kept for
10 years.It must contain the electrical wiring diagram, a drawing
or photograph of the system, the analysis of the risks and the
solutions adopted to deal with them, the manufacturer's declaration
of conformity for all connected devices, the operator's manual for
every device and the system maintenance plan;
fix a plate on the door indicating the automation data, the name of
the person responsible for commissioning, the serial number, the
year of construction and the CE mark;
also fit a plate specifying the procedure for releasing the system
by hand;
20
Disconnect the plug connector (Fig.19a).
Connect the new led stripe and insert them into the mask.
Insert the mask by placing first the seal side and then fastening it
with the screw (Fig.19b).
the relevant regulatory requirements, especially with the EN12453
standard which specifies the test methods for gate and door
automation systems.
check that all the connected devices (photocells, sensitive edges,
emergency buttons, etc.) are operating correctly by performing
door opening, closing and stop tests using the connected control
devices (transmitters, buttons or switches);
perform the impact measurements as required by the EN12453
standard, adjusting the control unit's speed, motor force and
deceleration functions if the measurements do not give the
required results, until the correct setting is obtained.
draw up the declaration of conformity, the instructions and
precautions for use for the end user and the system maintenance
plan and consign them to the end user;
ensure that the user has fully understood how to operate the
system in automatic, manual and emergency modes;
the end user must also be informed in writing about any risks and
hazards still present;
ATTENTION !
After detection of an obstacle, the door stops on opening and
automatic closing is excluded; to resume movement, press
the control button or use the transmitter.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Révo+ rep2024mRévo+ rep2024sRévo+ rep2224Révo+ rep2224s

Tabla de contenido