Compressor - Jobe E-DUNA SUP Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

The compressor is activated by holding the on/off switch for 3 seconds. Activate the first inflation phase by hol-
ding the on/off button for 3 seconds. The first phase lasts about a minute and a half and will automatically shut
itself off at the right pressure, but briefly pressing the on/off button will also deactivate the compressor.
(see picture)
Press and hold for 3 sec.
At this point place the Drive into the hole in the board, and continue with the second phase, which will take about
three and a half minutes. Again the compressor will automatically stop at the right pressure.
Again press and hold the on button for 3 seconds to activate the second inflation phase.
When the SUP is fully inflated after the second phase, the compressor will automatically shut off. At this point de-
tach the inflation hose (B-side) from the valve and fasten the valve cap (see pictures 1 & 2). Wait for the inflation
hose to cool down, then detach the inflation hose (A-side) from the compressor(see pictures 3 & 4). Wrap up the
inflation hose and store it inside the board bag (see picture 5). Put the cover on the Drive. As with opening the
cover of the Drive, this may take some force. Lean on it with your body weight (see picture 7). Attach it, turning
the screws until they are finger-tight.
1
B
Detach hose (B-side)
3
CAUTION HOT PART
DO NOT TOUCH!
Wait for hose (A-side)
to cool down
6
Put drive cover on

COMPRESSOR

2
Fasten the valve cap
4
A
Detach hose (A-side)
7
Push down to close cover
13
5
8
Turn screws Þnger-tight

Publicidad

Tabla de contenido
loading

Tabla de contenido