Studs must be plumb and square.
1
Position base in corner. Check for level left to right and
front to back.
IMPORTANT: If the subfloor is not flat and level, use
leveling compound or mortar bed to ensure that the
base is level (shown in Step 5).
92458 Rev. A
ROUGHING-IN
INSTALLATION
2
Mark unit position on floor and through drain opening.
Mark the locations of the studs on the flange of the
base.
NOTE: These marks are used to verify base location
after drain is installed in Step 4 and outline where
ashesive is applied.
3
38-1/2"
13"
13"
38-1/2"