NOTE
This heating sequence takes place only when the machine is swi-
tched on after it has been switched off completely with the main
switch ( 1 Pic.2). This sequence allows the heating up phase not
to require too much energy, thus avoiding problems of electrical
system overload in the place of installation.
51