Kohler K-528 Guia De Instalacion página 13

Válvula termostática de dos salidas
Ocultar thumbs Ver también para K-528:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Installation Checkout
Turn on the water supply to the valve.
Check all connections for leaks and make any adjustments as needed.
Checking the Valve Installation without an Installed Interface
Disconnect the power from the valve.
Insert the jumper into one of the valve sockets.
Reconnect the power to the valve.
Wait 10 seconds for the valve to initialize; outlets will activate.
Check all connections for leaks.
Disconnect the power, then remove the jumper.
Reconnect the power to the valve for normal usage.
Test for Proper Operation (Requires an Installed Interface)
Press the power icon on the user interface. The interface should turn on and the screen will be lit.
If not already completed, refer to the "Digital Interface User Guide" to set up the interface.
NOTE: For more information about using the user interface and its menus, refer to the user interface
Homeowners Guide.
Using the interface, turn on both water outlets.
Check for leaks and make any adjustments as needed.
Verify that the water flow is sufficient for your showering needs.
Exercising the Mixing Valve (Requires an Installed Interface)
NOTE: The maximum water temperature to the outlets is limited to 120°F (49°C). The valve will
automatically shut down if the temperature exceeds 120°F (49°C).
Kohler Co.
Jumper
13
1145587-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido