Descargar Imprimir esta página

Ozone Hyperlink V2 Manual De Instrucciones página 16

Publicidad

kiTe: 4-line closed cell To 5-line oPen cell conTinued
close the leading Edge air intake velcro.
kiTe: 5-line oPen cell
To 4-line closed cell
Open the undersurface zips (next to the centre of the kite)
16
13
lay out the kite and speed systems as you would for set up.
4
pull the isl line out from the plastic ring.
1
disconnect the lsl line from the two isl lines.
5
repeat for all three centre valves on the kite.
NOTE: On sizes 9m/11m/13m the outer valves (nearest the
wing tips) are not changed.
2
Wind the lsl line up and store it.
connect the isl line end to the internal knot using a larks
head connection.
14
3
6

Publicidad

loading