4
Operation
Aligning the warning pictogram
Check that the sealing ring (1) is correctly
positioned. Replace if necessary.
NOTE
The sealing faces and the sealing ring must
not be greased. Missing or defective sealing
rings must be replaced.
Carefully slide up the sleeve (2) and tighten
to 6.0...8.0 Nm to ensure leak tightness.
Perform the following steps to vertically align
the projector head (1):
Loosen the screw (2).
Align the projector head in the required
direction.
Tighten the screw to 3.0-4.0 Nm.
14
3
2
1
Projector head
2
Socket head screw M6x16 mm
3
Spring lock washer M6 and washer M6
Operating Instructions – 3008011680 EN – 06/2018
1
2
LWP_10
1
LWP_11