1. Prepare the Site
NOTICE: Measure your product for site preparation. Visit the
product page at www.kohler.com.br for more information.
Plumbing
Route the plumbing.
Cap the supplies and check for leaks.
Flooring
Apply water-resistant sealant to the subfloor. This will reduce the
risk of water damage.
Apply the finished flooring material prior to installing the bath.
Ensure the finished floor is level before proceeding with the bath
installation.
2. Prepare the Bath
WARNING: Risk of personal injury. Wear personal
protective equipment and obtain sufficient help to carefully
lift or move the bath. Cast iron baths are extremely heavy. If
the cast iron bath is not lifted properly, personal injury may
occur.
Place protective floor covering or a throw rug near the installation
area. This will prevent damage to the floor and bath when the
bath is set down.
With help, remove the bath from its carton and place it on top of
blocks on the protective floor covering.
Install the adjustable feet to the underside of the bath according
to the instructions packed with the feet.
Attach the drain and overflow fittings to the bath according to the
drain manufacturer's instructions. Do not connect the trap at this
time.
Kohler Co.
English-2
1084217-BR2-A