Tools And Materials; Before You Begin; Prepare The Site - Kohler K-11344 Guia De Instalacion

Ocultar thumbs Ver también para K-11344:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tools and Materials

Adjustable
Wrenches
Sealant

Before You Begin

IMPORTANT! To ensure a successful installation it is important that you install the bath on a level
finished floor.
IMPORTANT! This product requires a K-7219 drain for proper installation.
Observe all local plumbing and building codes.
Unpack and inspect the bath for damage. Return the bath to the carton until installation.
To simplify future maintenance, make sure all plumbing connections around the bath are easily
accessible.
It is strongly recommended that this installation be performed by a professional plumber or
contractor.
A minimum of two people are needed to perform this installation.
Traditional wood floors and special floating floors are recommended finished floor materials for this
bath installation.
Provide a minimum of 1800 lbs (816.5 kg) floor support under the bath.
This bath is designed for a freestanding installation only.
Select fasteners and the drilling method based on the type of floor the bath will be attached to.
This bath conforms to ANSI Standard Z124.1.2. All dimensions are nominal.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.

1. Prepare the Site

NOTICE: Provide adequate floor support. Consult the roughing-in document packed with your bath for
specific floor loading requirements.
Ensure the subfloor offers adequate support for your bath.
Ensure the subfloor is level.
1055344-2-B
Tape
Pencil
Measure
Drill
Drill Bits
Blade
Level
Screwdriver
Plus:
• Conventional woodworking tools and materials
• Drop cloth
• Fasteners
• Hacksaw
• Metal shims
• Rags
• Saw Horses
2
Keyhole/Compass
Saw
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-14037

Tabla de contenido