Starting The Equipment; Stopping And Depressurising The Equipment - Parker domnick hunter BAM10 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.2 Starting the equipment

1
Ensure that the inlet and outlet isolation valves are closed.
2
Connect the electrical supply to the module and verify that the power on indicator on the front of the dryer is illuminated.
3
Slowly open the inlet isolation valve and verify that there are no leaks within the module.
4
Check that the system pressure relief valve is closed.
5
Test the condensate drains of the filters and ensure they are discharging correctly into a suitable collection vessel.
6
Slowly open the outlet isolation valve to allow the system to pressurise.
The module is designed for continuous use and, once running, requires no further operator intervention.

4.3 Stopping and depressurising the equipment

1
Close the outlet isolation valve followed by the inlet isolation valve.
2
De-pressurise the module by venting through the drain ball valve on the outlet dust filter.
Note: The drain valve should be opened gradually.
3
Disconnect the electrical supply to the dryer
Note: A small amount of air may be trapped between the inlet isolation valve and the dryer inlet.
14

Publicidad

Tabla de contenido
loading

Tabla de contenido