Door Installation - OVE MELBA 60 TD Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1-2. Place the door (C) on the sliding bar (L).
3. Place the magnetic track (K) on the door (C).
4-6. Adjust the angle of the door (C) to ensure the fittness between the door (C) and the magnetic track (G).
O
P
1
L
C
3
K
C
5
G
C

DOOR INSTALLATION

Note: When install the door panel on the left
side, unintall the top and bottom rollers (O & P),
rotate the door panel and reinstall the rollers,
keep the silk screen outside.
12
O
P
2
C
L
4
O
EE
6
G
C

Publicidad

Tabla de contenido
loading

Tabla de contenido