Steren K-310 Manual De Instrucciones página 14

Kit para experimentar energia verde
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Connect the black (LCD) clock cable to one of the magnesium bars. Then
connect the red cable from the LCD (positive) clock to the copper bar. All
components are now connected.
3. Insert the copper and magnesium bars into the potatoes, as shown in the
picture, be careful that the metal bars do not touch each other. The watch
should start working.
4
MAKE THE EXPERIMENT

Publicidad

Tabla de contenido
loading

Tabla de contenido