Installation Instructions - GE UPK3 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLING PUMP KIT
DISCONNECT ELECTRICAL POWER
1
WARNING
Death or serious injury can result from failure to
follow these instructions.
• Service by a qualified service technician only.
• Disconnect power before servicing this product.
• Reconnect all grounding devices after service.
• Replace all parts and panels before operating.
2
REMOVE BACK PANEL
A. Remove all ice if applicable.
B. Drain reservoir by removing reservoir drain
cap. Replace cap when water has drained.
Drain Cap - Nugget Model
C. Remove the screws from the back panel
(19 for gourmet cube models; 15 for nugget
models).
UCC15
Gourmet
Cube Model
Screw
Locations
2

Installation Instructions

Electrical Shock Hazard
Drain Cap - Gourmet Cube Model
UNC15
Nugget Model
Screw
Locations
D. Remove the side service panel. Pull out on the
left side (1) and back (2) to remove.
2
1
REMOVE FRONT PANELS
3
A. Open the ice machine door all the way.
B. Remove the Service Panel.
C. Remove the Kickplate by removing the 2
screws securing it to the base.
Service Panel
(Gourmet Cube
Machine Shown)
4
REMOVE EXISTING DRAIN HOSE
Remove the existing drain hose. The drain hose
is the white tube with a white snap fit clamp
on it in the upper left hand corner of the side
service panel access area. Save the snap fit
clamp. It will be used to install the new drain
hose.
Snap Fit Clamp
Kickplate Screws
Existing Drain Hose

Publicidad

Tabla de contenido
loading

Tabla de contenido