Finalize Installation - GE UPK3 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLING PUMP KIT
INSTALL THE PUMP KIT (Cont.)
5
I. Refer to the unit's wiring diagram and
re-check all electrical connections for proper
placement.
J. Connect drain hose to bin drain, and secure
with the snap fit clamp reserved from
removing the old drain hose.
Bin drain
6
FLUSH OUT THE DRAIN HOSE
A. Restore power to the unit.
B. With the unit still OFF, pour several quarts of
water into the bin. The drain pump should turn
on and pump the water out of the bin, cycling
on and off several times during the process.
Pump cycling is normal since the pump-out
rate of the drain pump is greater than the rate
of drain through the bin.
C. While the pump is discharging water,
THOROUGHLY CHECK THE ENTIRE DRAIN
SYSTEM FOR LEAKS.
GE
Appliances
Appliance Park
Louisville, KY 40225
GEAppliances.com
4
Installation Instructions
(Continued)
Snap fit clamp
Drain hose
7
GOURMET CUBE ICE MACHINE ONLY
Attach stainless steel shield to side of
condenser shroud using provided screws.

FINALIZE INSTALLATION

8
A. Re-install all panels and covers.
B. Re-install unit into built-in or free-standing
location. ENSURE THAT NO KINKS OCCUR
IN WATER INLET OR DRAIN TUBING. Double-
check for leaks!
C. Restore potable water supply and restart the
unit. Check unit to ensure proper operation
and to allow a final check for leaks of any
kind.
Shield

Publicidad

Tabla de contenido
loading

Tabla de contenido